After “DAN CISNE”, the sister DP2 Shuttle Tanker “DAN SABIA” from KNOT Management docked at Lisnave for the 2nd Special Survey and Drydocking maintenance works, including the overhaul of the CP propulsion system, Azimuth Thrusters, Bow Loading System and the installation of a Ballast Water Treatment System.